Rezoning Adoptions, Australia, May 2017

13/06/2017 5:58 am

Blockbrief's Rezoning Adoption Data showed that there was 64 rezoning instrument adoptions across Australia in May 2017 providing additional capacity for up to 7,808 dwelling units and development projects to generate 2,686 jobs nationally. This capacity can potentially be realised after development applications/planning permits and buildings applications are approved for the respective land, with an estimated staging average of 2.32 years (Min. 0 years and Max. 20 years). The capacity of 7,808 dwellings units made available as a result of rezoning adoptions in May 2017 consisted of 6,801 dwellings (87.10%) and 1,727 lots (22.11%).

 

 

Looking specifically at the type of rezonings adopted in Australia in May 2017, 25.39% of them were mixed, 15.23% residential, 11.17% special, 8.13% commercial, 4.6% rural and 1.2% industrial.

 

New South Wales

The 26 rezoning instrument adoptions in New South Wales in May 2017 provide capacity for up to 5,954 dwelling units and development projects with the potential to generate 2,660 jobs. The estimated staging average is 2.3 years (Min. o years and Max. 20 years).

 

Queensland

The 2 rezoning instrument adoptions in Queensland in May 2017 provide capacity for up to 797 dwelling units and development projects with the potential to generate over 2 jobs. The estimated staging average is 5 years (Min. 0 years and Max. 10 years).

 

Victoria

The 12 rezoning instrument adoptions in Victoria in May 2017 provide capacity for up to 56 dwelling units and development projects with the potential to generate 8 jobs. The estimated staging average is 2.25 years (Min. 0 years and Max. 5 years).

 

Western Australia

The 20 rezoning instrument adoptions in Western Australia in May 2017 provide capacity for up to 941 dwelling units and development projects with the potential to generate 12 jobs. The estimated staging average is 2.22 years (Min. 0 years and Max. 10 years).

 

South Australia

The 1 rezoning instrument adoption in South Australia in May 2017 provide capacity for over 2 dwelling units and development projects with the potential to generate over 2 jobs. The estimated staging average is 5 years (Min.5 and Max. 5).

 

Northern Territory

The 1 rezoning instrument adoption in Northern Territory in May 2017 provide no capacity for dwelling units and development projects with the potential to generate over 2 jobs. The estimated staging average is 1 year (Min. 1 and Max. 1).

 

Australian Capital Territory

The 2 rezoning instrument adoptions in the Australian Capital Territory in April 2017 provide no capacity for dwelling units and no job generating development projects. The estimated staging average is 1 year (Min. 1 year and Max. 1 year).

 

The following states had no rezoning instrument adoptions in May 2017:

  • Tasmania

 

Find out the individual properties rezoned with a Blockbrief membership

Learn-More-Button-Orange-180px